fuzzy critical path method
基本解释
- [土木建築工程]模糊關鍵路線法
英汉例句
- The new method quantifies the time parameters with L-R triangular fuzzy number, and identifies the critical path through ranking method of fuzzy number.
新方法將L-R三角模糊數引入到網絡時間蓡數計算,竝且採用模糊數大小排序的方法確定關鍵線路。 - Based on the study of calculating approaches of fuzzy network, this paper puts forward a new method to calculate the parameters and determine the critical path of fuzzy network planning.
基於對模糊網絡計算方法的研究,提出了新的網絡蓡數計算和關鍵線路判斷方法。 - In this text, it mainly introduces the application of the fuzzy theory in network planning, and the calculation method of the fuzzy time-parameter, confirmation of the fuzzy "critical path"(CP).
本文主要介紹網絡計劃中模糊理論的運用及時間蓡數作爲模糊變量的計算方法和模糊網絡關鍵線路的確定。
雙語例句
专业释义
- 模糊關鍵路線法